When I worked on FCS,* they were called a "Unit of Action," and I didn't get it then.
The final word on this is in the final 'graph of the linked post:
And the kicker? While the BCTs are supposed to be able to deploy faster to meet immediate needs, the report contends that while they will be able to respond more quickly than the Division model currently in use, “they require roughly the same amount of time to transport their equipment overseas.”FCS, the gift that keeps giving.
*Full disclosure, I worked on the Future Recovery and Maintenance Vehicle, FRMV, "wrecker" variant of the FCS-MGV† from 2003-2006 at United Defense (later BAE Systems after the Carlyle Group sold me to buy Dunkin Donuts).
†Future Combat Systems-Manned Ground Vehicle. These are the ones that are the tanks and APCs. As opposed to the various unnmanned vehicles, networking technologies, etc. that form the full FCS along with the MGVs.‡
‡Yes, I have worked everywhere. Maybe I can't hold down a job, but more likely this has been my role as "technical hit man", where you are parachuted in to take care of a specific need.
No comments:
Post a Comment