Tuesday, May 22, 2018

Speaking of Bureaucrats Lying to Legislators,

The ational Nuclear Security Administration (NNSA) has been lying to legislators to encourage them to dump billions into new warheads:
There are many reasons to keep certain parts of the U.S. nuclear weapons complex a secret. But fraud, waste, and abuse run rampant when the mystique and awe of nuclear bombs gets in the way of effective oversight. And it is the taxpayer who ends up suffering.

The secrets to creating a nuclear explosion and the materials to do so are kept by the National Nuclear Security Administration (NNSA), a semi-autonomous agency within the Department of Energy, and it has a $1.2 trillion plan to build new nuclear warheads and facilities over the next 30 years.

But new documents obtained by the Project On Government Oversight (POGO) discussing the life expectancy of nuclear weapons components show that the uranium cores may have a longer life span than originally thought. This may undermine some justifications for an expansive—and expensive—nuclear modernization plan.

Although much of the documents are redacted, likely to keep safe the most sensitive details of the U.S. nuclear enterprise, the remaining details seem to suggest that initial life-span estimates were too conservative. These initial estimates were partially used as justification for plans to build an expensive new facility and revising plans based on these findings could result in billions of savings for taxpayers.
But there’s no getting around the fact that twice now the NNSA has either obscured facts that would suggest a more limited capacity is all that’s required or has pursued an expensive plan without knowing all the facts beforehand.
In light of NNSA’s rhetoric about the aging nuclear arsenal and the desperate need for more money to modernize, POGO endeavored to determine exactly what upgrades were truly needed to support a credible nuclear deterrent. In 2013, we released a report that called for a study into the lifetime of uranium secondaries in order to determine what capacity would be required of a proposed new facility. A study would make clear how many of these secondaries would need to be manufactured in the new building. POGO’s report on the proposed Uranium Processing Facility (UPF) highlighted how the public was being kept in the dark about this number, an important justification for continued and increased funding. At the time, a number of Energy Department sources told POGO several hundred warheads had already gone through the life extension process and would not need remanufactured secondaries.
Once again I will quote Ike, "Every gun that is made, every warship launched, every rocket fired signifies, in the final sense, a theft from those who hunger and are not fed, those who are cold and are not clothed."

Saturday, April 28, 2018

Faster, Better, Cheaper

An uptick in exports has led Saab to increase spending on its Gripen E program:
Strengthening interest in the Gripen E has prompted Saab to accelerate its investment in the programme, with the step to include the introduction of enhancements intended to heighten the product's attractiveness to prospective buyers.

"Due to the strong interest in Gripen E/F, Saab has now accelerated the pace of investment to develop the system for future exports," the company disclosed in a quarterly results announcement on 26 April.

Chief executive HÃ¥kan Buskhe describes the measure as relating to "industrialisation, and also some key development on features for the export market". While he declines to identify specific updates, he notes: "There are things that will enhance the product that we have seen during the development time for the Gripen E." This process began for launch customer the Swedish air force in 2013.

Buskhe says Saab received fresh interest in the new-generation fighter from several undisclosed nations during the first three months of this year. The company cites a long list of prospective customers for the type, including Austria, Bulgaria, India and Slovakia.

Saab will deliver its first production examples of the Gripen E to Sweden and export buyer Brazil next year and the nations will receive a combined total of 96 examples up to 2026. Buskhe says the level of interest being shown in the product is consistent with previous forecasts of a total production run of at least 400 units.
The Gripenis less than half the size, and less than half the direct operating costs, of its competitors, while being (at least) nearly as capable in terms of everything but payload and range.

It's been on budget, and on schedule, and (unlike the F-35) nations have the information to incorporate their own weapons into the aircraft.

It's not surprising that it's doing well:  It's in a very similar position to that of the Mirage III in the 1960s.

Tuesday, April 17, 2018

I Guess that they Don't Need to Put a Contractor in Every Congressional District Now


Early in the process, the goal was to spread work around to as many Congressional districts as possible, but now that the proram is too big to fail, they are looking for people who can actually do the work competently for a reasonable price:
The Pentagon is embarking on a comprehensive effort to examine the entire F-35 supply chain from top to bottom for opportunities to compete components and repair work, a top Defense Department official says.

The move is aimed at incentivizing suppliers to reduce cost and increase efficiencies, as the F-35 enterprise faces severe parts shortages and a skyrocketing sustainment bill (AW&ST April 9-22, p. 40).

The department’s efforts to inject competition into the supply chain comes as the F-35 program faces challenges on the production line. The rate of mistakes by suppliers or skilled workers during the manufacturing process is too high, according to F-35 Program Executive Officer Mat Winter.

………

As the government and Lockheed work to get support costs under control, competition and alternative parts sourcing could be key, Robert McMahon, assistant secretary of defense for logistics and materiel readiness, said during Aviation Week’s MRO Americas conference in Orlando, Florida, April 11. The F-35 operations and sustainment bill has been pegged at more than $1 trillion over the life of the program.
The current structure was driven by politics, not competence or efficiency, and it is a remarkably wasteful way to create jobs.

To quote Ike, "Every gun that is made, every warship launched, every rocket fired signifies, in the final sense, a theft from those who hunger and are not fed, those who are cold and are not clothed."

Thursday, April 5, 2018

F-35 Sustainment Challenges Mount As Global Fleet Grows | Defense content from Aviation Week

What a surprise.

Lockheed-Martin promised that the F-35 would have support costs near that of the far smaller F-16, because of it's advanced logistics software.

Right now, it looks like it will cost more to operate than the twin engine F-15:


………

This specific problem was resolved quickly, but that is not often the case. Across the F-35 enterprise, operators are struggling with severe maintenance challenges of which the most critical are a spare parts shortage, insufficient repair capacity and excessive glitches in the ALIS logistics system that tracks the health of the fleet. Meanwhile at the production level, suppliers and skilled workers are making mistakes that slow down the manufacturing process before a complete aircraft even comes off the line.

The sustainment challenges are emerging at a pivotal time for the program, with F-35 pilot training ramping up, international deliveries accelerating, and the Navy on track to achieve initial operational capability of its F-35Cs in 2019. As the global F-35 fleet is poised to triple by 2021, government and industry officials are facing mounting pressure to solve these challenges—and fast.

Reports emerged recently that the U.S. Air Force—the F-35’s single largest customer—would be forced to cut as many as 590 F-35s from the overall buy, or one-third of the force, if sustainment costs do not come down. The government-industry team must find a way to reduce operations and sustainment (O&S) costs or F-35 customers will have to make “tough decisions,” Air Force Secretary Heather Wilson said ominously during a recent event in Washington.

The Air Force is working with the JPO to reduce overall O&S costs by 38% over the next 10 years, or about $3.8 billion a year, Wilson says. And in the field, the Air Force aims to get the cost to sustain the F-35 down to that of sustaining a legacy F-16, according to Chief of Staff Gen. David Goldfein.

………

The main F-35A training hubs, Luke and Eglin AFB, Florida, arguably are facing the most immediate challenge as the Air Force grapples with a critical pilot shortfall.

………

But it is not just the training bases that are impacted by the spare parts problem. Overall from January through Aug. 7, 2017, F-35s were unable to fly because they were awaiting parts on average about 22% of the time—more than double the Pentagon’s goal of 10%, according to the Government Accountability Office (GAO).

………

ALIS, the maintenance hub of the F-35 enterprise, was designed to ease the burden on maintainers by increasing automation. But today the system, which is based on a 1995 architecture, actually is adding to their workload.

ALIS has an excessive rate of “false positives,” where the system mistakenly tells the maintainers a certain part is broken. Even more troubling, each service continues to rely heavily on contractor-provided information technology experts, rather than service personnel, to manipulate ALIS’s intricate software and complex databases, according to the subcommittee chairman, U.S. Rep. Mike Turner (R-Ohio).

In the field, maintainers must rely on inefficient workarounds and manual tracking processes when ALIS is not performing as it should, officials say. In some of the Air Force’s maintenance units, for example, airmen are assigned to tackle ALIS glitches as their primary job, says Harris, which was certainly not in the original plan.
(emphasis mine)


Lockheed-Martin developed a tightly integrated system as a way of maximizing their ability to lock in customers to their support services,



So you have a gargantuan mass of interdependent code, and fixing problems is like untying the Gordian knot.

The F-35 is never going to be as cheap to operate as an F-16, the JSF's MTOW is 65% more than the that of the F-16, but right now, it's simply too expensive to operate in significant numbers.

Friday, March 23, 2018

OOPS!

Belgium is planning to acquire a replacement for its F-16 fleet, and the leader in this contest is the F-35 mistake jet.

It now turns out that the government concealed options from the lawmakers to get the procurement approved:
Belgium’s future fighter program has been thrown into turmoil after it emerged that cheaper options to extend the life of the country’s F-16 Fighting Falcons had been deliberately hidden from ministers.

The scandal, which has already resulted in the suspension of several military officers and civil servants, came to light after the leaking of a Lockheed Martin assessment dated April 2016 to several Belgian news outlets on March 20. The documents suggested the country’s F-16s could be upgraded and given another six years of operational life, making a new fighter purchase less urgent than government officials had previously contended.

Defense Minister Steven Vandeput told the country’s Parliament that he had not been made aware of the report about the potential life extension option.

“If this report actually exists, if its content is accurate, and if the defense [ministry] has decided not to share it, there is a problem,” Vandeput told a Belgian radio station.
Yes, it is a problem.

Welcome to the military-industrial complex, Belgium.

Thursday, March 22, 2018

A Cool Idea That Isn't Going Anywhere

Saab is once again is considering marinizing the Gripen fighter for carrier use.

Technically, the airframe is already well suited to carrier use, but who is going to buy it?

The only countries that operate, or will operate, carriers with arrester gear are the US, France, China, Russia, Brazil, and India.

That's a small market, since only Brazil and India won't buy their own aircraft, and that is a very small production:
Based on the in-development Gripen E, the model would be capable of operating from aircraft carriers configured either for short-take-off but arrested recovery (STOBAR) or catapult-assisted take-off but with arrested recovery (CATOBAR) operations.

"We have a fully certified design that has been signed off by Saab management for the maritime version of Gripen," says Tony Ogilvy, head of marketing for the Gripen M. "It's in our portfolio, but it is only a design. We have not taken it to the next critical step, which will require a customer."

Ogilvy's background is carrier aviation. During a three-decade career in the UK Royal Navy he flew Blackburn Buccaneers for 12 years and British Aerospace Sea Harriers for six, including from several of the service's carriers. He contends that Saab's model-based systems engineering approach offers a "very high level of fidelity" that should, if a Gripen M customer is obtained, result in a concept demonstrator that works well first time.

………

Given that Sweden has no plans for aircraft carriers, the two potential markets for the Gripen M are Brazil and India.

The Brazilian air force has ordered 28 single-seat Gripen Es and eight two-seat F-model examples, being developed with Embraer. Its new fighters will be delivered between 2019 and 2024, including eight single-seaters and seven twin-seaters built in Brazil.

The nation's navy is also interested in replacing its retired aircraft carrier, the Sao Paolo, although this requirement has yet to be fully defined. Should Brazil's plans for such a new vessel gain traction, it could provide an opportunity for the Gripen M.

In India, Saab, Boeing and Dassault have responded to a request for information for 57 carrier-based fighters. India has one STOBAR-configured ship, equipped with RAC MiG-29Ks, and has plans for an additional example. Longer term, it has plans for a more potent CATOBAR carrier, potentially using General Atomics' electromagnetic aircraft launch system, as opposed to conventional steam catapults.
There is a whole flock of ducks that need get in a row before Saab can even think about putting in a serious bid.

Not gonna happen.

Cool idea though.

Sunday, March 4, 2018

It's All about the Defense Contractors, Isn't It?

Iraq is looking at purchasing the S-400 surface to air missile system from Russia, and the US is threatening sanctions:
Having suffered two decades of US-led bombing campaigns, terrorist insurgency and sectarian violence, Iraq is now trying to protect its airspace. But the US threatens to slap it with sanctions if it buys Russian missile systems.

Baghdad has recently expressed interest in purchasing Russia’s advanced S-400 surface-to-air missile defense systems. However, if Iraq goes forward with the plan, it faces a dilemma: the US could potentially retaliate with sanctions under the Countering America’s Adversaries Through Sanctions Act of 2017 (CAATSA).

"We want to purchase any weapons that will strengthen the security of Iraq and the country's armed forces. At the same time, we respect regional and international commitments,” Iraqi Foreign Minister Ibrahim Jaafari told RIA Novosti on Wednesday. “There are a number of obstacles on the path [of buying] S-400 systems. The Iraqi side is still negotiating, and when the final decision is made, it will be considered," Jaafari added.

According to State Department spokesperson Heather Nauert, Iraq has already been warned that purchasing S-400 systems could violate CAATSA, which imposes sanctions on countries which purchase weapons from Moscow.
As confirmed by this official State Department Briefing, it appears that the US foreign policy apparatus has been become little more than a lever to sell US weapons systems.

Thursday, February 1, 2018

Today in Faith Based Missile Defense

Another ABM system fail, this one a $30 million test of "Aegis Ashore" in Hawaii:
$30 million missile touted as a possible second layer of defense for Hawaii from North Korean threats reportedly failed in its first-ever flight from Kauai’s Aegis Ashore facility today when it did not intercept a target representing an intermediate-range ballistic missile.

U.S. Pacific Command put out a statement saying only: “The Missile Defense Agency and U.S. Navy sailors manning the Aegis Ashore Missile Defense Test Complex conducted a live-fire missile flight test using a Standard-Missile (SM)-3 Block IIA missile launched from the Pacific Missile Range Facility, Kauai.”

The Pentagon is not publicly revealing the failure because of possible ramifications with North Korea tensions as well as concern for the upcoming South Korean Olympic games, CNN reported. According to the news channel, the target missile was launched by an aircraft.

Raytheon’s new SM-3 Block IIA missile, co-developed with Japan, is seen as a possible second layer of protection for Hawaii from North Korean intercontinental ballistic missiles in addition to ground-based interceptors in Alaska and California — the only other line of defense.

The SM-3 IIA missile now has a record of one intercept in three tries off Kauai.
Rule one of ABM systems is, this sh%$ is hard.

Rule two of ABM systems is, this sh%$ is WAY more expensive than what they are shooting at you.

It's a sucker's game, but given defense contractors need a new boat.

Tuesday, January 30, 2018

Longer Range, More Payload, Superior Performance, Lower Cost, What's Not to Love?

The Israeli Air Force is inclined to order an advanced variant of the F-15 instead more F-35s.

Even if there are things that the F-35 can do that the F-15 can't, you want to minimize spending on silver bullets:
The Israel Air Force is to decide in a few months between purchasing a third squadron of F-35 fighter jets or the F-15I, which, while less advanced, has other advantages.

The acquisition requires the approval of the General Staff and a ministerial committee, but the recommendation of the air force generally carries the day.

IAF Commander Maj. Gen. Amikam Norkin, who reportedly is leaning toward the F-15, is to submit a recommendation in May.

Israel and the United States agreed last year on the purchase of 50 F-35 fighters, two squadrons, from Lockheed Martin, with delivery completed by 2024.

………

Senior IAF officers, including the force’s previous commander, Maj. Gen. Amir Eshel, have lavished praise on its capabilities. One of its most important operational capabilities is stealth, the ability to not show up on enemy radar.

But in order employ its stealth capabilities, the F-35 must fly with its bombs inside the plane’s belly, which limits its carrying capacity. If the bombs are carried on the outside of the plane, its stealth capabilities are impaired.

The F-15, though older, has two advantages over the F-35: a longer flight range and the ability to carry larger bombs. Another factor in its favor is that it’s built on a different platform, which means the air force would have a mix of planes rather than relying on a single model.

The F-15I is also cheaper to operate than the F-35. But the plane is currently being upgraded by the manufacturer, Boeing, and its purchase price is expected to rise in any future deal. Thus it could end up costing the same as the F-35 does next time around.
I gotta figure that there are elements in the IAF who are seriously worried that some crucial features of the F-35 will go completely titsup when the sh%$ hits the fan.

My money would among the items worrying IAF planners is its the JSF's ill-starred Autonomic Logistics Information System (ALIS).

Saturday, January 27, 2018

More Mistake Jet Follies

It's supposed to dominate the skies, it's supposed to provide close air support to the troops on the ground, and it's supposed to have unparalleled reliability and availability.

Not so much:


Efforts to improve the reliability of Lockheed Martin Corp.’s F-35 are “stagnant,” undercut by problems such as aircraft sitting idle over the last year awaiting spare parts from the contractor, according to the Pentagon’s testing office.

The availability of the fighter jet for missions when needed -- a key metric -- remains “around 50 percent, a condition that has existed with no significant improvement since October 2014, despite the increasing number of aircraft,” Robert Behler, the Defense Department’s new director of operational testing, said in an annual report delivered Tuesday to senior Pentagon leaders and congressional committees.

The F-35 section, obtained by Bloomberg News, outlined the status of the costliest U.S. weapons system as it’s scheduled to end its 16-year-old development phase this year. Starting in September, the program is supposed to proceed to intense combat testing that’s likely to take a year, an exercise that’s at least 12 months late already. Combat testing is necessary before the plane is approved for full-rate production -- the most profitable phase for Lockheed.

Pentagon officials including Deputy Defense Secretary Patrick Shanahan and chief weapons buyer Ellen Lord have highlighted the need to reduce the F-35’s $406.5 billion projected acquisition cost and its estimated $1.2 trillion price tag for long-term operations and support through 2070. Still, the Defense Department is moving to accelerate contracting and production for the fighter despite the persistence of technical and reliability issues disclosed in the current phase of development testing.
16 years in development, and it still does not work.

This has all gotten so dysfunctional that I'm waiting for a horse to be appointed to the Senate.

Monday, January 1, 2018

Missile Deal is Signed

Turkey has officially signed a deal with Russia to buy S-400 Triumf surface to air missiles:
Turkey has finalized a deal with Russia to purchase the S-400 Triumph (SA-21 Growler) missile defense system, in a move that is likely to irritate NATO allies. The deal was signed by Ankara on Friday, Dec. 29. ………
NATO in general, and the US military in particular are freaking out over this, because, as I have noted before, the Pentagon sees NATO as a sales vehicle for American weapons.

The Russian system is more capable, and cheaper, and given its origin, it is probably easier to maintain, but none of this matters to NATO leadership, because it doesn't support the western arms manufacturers.

So basically, you have the military industrial complex on one side, and Recep Tayyip ErdoÄŸan on the other.

I'm just hoping that there is a way that they can both lose.

Saturday, October 28, 2017

And the Mistake Jet Cluster F%$# Continues

The F-35 was intended to be a major technical leap, not just in performance (it isn't), and not just in stealth (it isn't), but also in terms of its availability and maintenance overhead.

It turns put that it has failed the last bit as well:
The Pentagon is accelerating production of Lockheed Martin Corp.’s F-35 jet even though the planes already delivered are facing “significantly longer repair times” than planned because maintenance facilities are six years behind schedule, according to a draft audit.

The time to repair a part has averaged 172 days -- “twice the program’s objective” -- the Government Accountability Office, Congress’s watchdog agency, found. The shortages are “degrading readiness” because the fighter jets “were unable to fly about 22 percent of the time” from January through August for lack of needed parts.

The Pentagon has said soaring costs to develop and produce the F-35, the costliest U.S. weapons system, have been brought under control, with the price tag now projected at $406.5 billion. But the GAO report raises new doubts about the official estimate that maintaining and operating them will cost an additional $1.12 trillion over their 60-year lifetime.

Already, the agency said in the draft obtained by Bloomberg News, the Defense Department “must stretch its resources to meet the needs of continued system development and production while at the same time sustain the more than 250 aircraft it has already fielded.”
In addition to this, it has been revealed that the first 108 F-35s produced will never be combat capable, so something around $40 billion has been flushed down the toilet:
The new F-35 program executive officer, U.S. Navy vice admiral Mat Winter, said his office is exploring the option of leaving 108 aircraft in their current state because the funds to upgrade them to the fully combat-capable configuration would threaten the Air Force’s plans to ramp up production in the coming years.

These are most likely the same 108 aircraft the Air Force reportedly needed to upgrade earlier in 2017. Without being retrofitted, these aircraft would become “concurrency orphans” — airplanes left behind in the acquisition cycle after the services purchased them in haste before finishing the development process.

Left unsaid so far is what will become of the 81 F-35s purchased by the Marine Corps and Navy during that same period. If they are left in their current state, nearly 200 F-35s might permanently remain unready for combat because the Pentagon would rather buy new aircraft than upgrade the ones the American people have already paid for.

 What makes this particularly galling is the aircraft that would be left behind by such a scheme were the most expensive F-35s purchased so far. When the tab for all the aircraft purchased in an immature state is added up, the total comes to nearly $40 billion.
If you run the numbers, that is about $370 million for each of these hangar queens.

Imagine what could have done with that money.

Saturday, October 14, 2017

Israel Has 2Nd Thoughts about V-22 Acquisition


V-22s Range Advantage has a Cost
Israel seemed poised to purchase the tilt-rotor V-22 Osprey, and now they have put this on hold.

I am not particularly surprised.

The V-22 is a maintenance hog, and cost a fair amount to operate.

While the Osprey is about 100 kts faster, has a longer range, it can only carry about 1/3 of the payload, even though it has 2/3 of the installed power.

Additionally, unlike a conventional helicopter, the V-22 does not have a meaningful auto-rotation capability, and its performance with external loads is pathetic.

Israel simply does not have the need for the additional capabilities offered by the tilt-rotor:
The Israeli air force has frozen its evaluation of the Bell Boeing V-22 Osprey, with a senior defence source indicating that the tiltrotor is unable to perform some missions currently conducted using its Sikorsky CH-53 transport helicopters.

In January 2014, the US Department of Defense notified Congress about its intention to sell six V-22s to Israel. This followed an evaluation conducted by air force personnel, which led to the service seeking a rapid acquisition to support special operations. The proposed purchase met with opposition from elsewhere within Israel's defence ministry, however.

Other potential candidates to replace the Israeli air force's aged CH-53s by around 2025 include Sikorsky's new CH-53K and the Boeing CH-47 Chinook.
Simply put, the IDF does not have the requirements, such as amphibious landings from extreme distance, that have driven the V-22, and as such, it does not make sense.

Friday, August 11, 2017

Of Course Heads Are Exploding, Their Post Retirement Sinecures Are at Risk

Turkey is in serious discussions with the Russians over procuring their very long range SAM systems, and the US military is having a major sh%$ fit over this:
The Pentagon on Monday criticized Turkey’s plans to purchase a Russian air-defense system instead of investing in NATO technology.

Turkish President Recep Tayyip Erdogan is in talks to get Russia to supply Ankara with its latest S-400 surface-to-air missile system.

Pentagon spokesman Navy Captain Jeff Davis said the Pentagon had concerns over its NATO ally’s purchase of the Russian technology because it might not work with other equipment used by the 29-nation alliance.

………

The S-400 system has a range of about 400 kilometers (250 miles) and is designed to shoot down enemy aircraft.
The Patriot has a range of about 160 km (200 miles), significantly less than the S-400, and unlike the Patriot system, it was designed from the start to be a part of an IADS (integrated air defense system), which means that integrating it with (Russian) short range missiles and AAA is easier and more straightforward.

Incorporating NATO standard IFF (identify friend or foe) into this system is not rocket science.  (Pun not intended)

US and NATO doctrine has always been about air superiority being the primary way to protect the troops on the ground, the Russians, and the Soviets before them, relied far more on an IADS, and so have applied more resources to these systems.

Because of this, their systems are more capable than western systems.

The Pentagon is freaking out because some of the generals are worried that a comfortable retirement as a consultant at Raytheon are jeopardized.

Wednesday, August 9, 2017

This Makes the F-35 Program Look Well Run

I am referring, of course, to India's history with developing indigenous weapons systems.

For example, we have the now-terminated and protracted development of the Arjun tank and the INSAS rifle system, but Tejas program, has suffered through a 33+ year development program is crown jewel of this dubious crown.

And now we see more schedule slippage:
The Indian Ministry of Defence (MoD) has revealed further delays in the country’s programme to produce the Tejas Light Combat Aircraft (LCA) for the Indian Air Force (IAF).

The MoD said in a statement on 4 August that state-owned Hindustan Aeronautics Limited (HAL) has delivered just four aircraft to the IAF out of 40 ordered in 2005. All these aircraft were previously scheduled to be delivered to the IAF by 2017–18.

The four aircraft so far delivered are from a batch of 20 designated for initial operational clearance (IOC), while the remaining 20 aircraft were designated for final operational clearance (FOC).

The MoD said that 12 remaining aircraft under the IOC batch are at the production stage and four more aircraft, which will be used as trainers, will be produced following necessary approvals by the MoD’s Aeronautical Development Agency (ADA).

It added that production of the 20 FOC aircraft will also depend on clearance by the ADA, which has led the Tejas development programme for the past three decades.
This is f%$#ed up and sh%$.

Sunday, July 23, 2017

Aircraft Carrier Fail

The first in class Gerald Ford aircraft carrier has just been commissioned, unfortunately, it's not ready for combat, and won't be for a very long time, because the US Navy is deferring essential testing to the second ship in the class:
Three years late and costing $12.9 billion, the USS Gerald R. Ford finally gets commissioned today at Norfolk Naval Station in Virginia. The latest aircraft carrier to join the American fleet has been burdened with—and this may shock you, considering we are talking about defense spending—cost overruns and significant delays. Despite being commissioned, it will be at least four years before the carrier will be able to deploy and truly become part of the fleet.

Many challenges remain for the carrier as substantial amounts of construction and testing remains to be completed. In fact, one significant problem to be solved involves launching and recovering aircraft, which is the sole reason aircraft carriers exist.

………

Incorporating many significant changes over its predecessors, the Ford-class will have newly designed catapults and arresting gear, a redesigned and smaller island superstructure that is farther aft, a larger flight deck, new radar systems, quicker weapons elevators and 300 percent more electrical capacity from newly designed nuclear reactors.

The problem is that many of these systems are immature and have not been able to perform up to expected levels. The San Diego Union-Tribune described the construction of the Ford as “a monument to the Navy’s and defense industry’s ability to justify spending billions on unproven technologies that often deliver worse performance at a higher cost.” Despite the lip service presented by Navy and industry officials, the construction of the Ford has been something of a disaster.


To be fair, no modern warship is ready to sail off to war the day after being commissioned. Tests need to be completed and the ships need to be put through their paces to discover any abnormalities or deficiencies that may not have been discovered during builder trials, when the ship is put to sea under the watchful eye of the company that constructed the ship.

The Ford is a special case, however. So many systems are deficient and remain unresolved that the Navy does not expect the carrier to reach IOC, or initial operational capability, until 2020 at the earliest.

Once commissioned it is expected the Navy will run the Ford through a series of tests between March and November of 2018. After that, it is hoped the Navy will put the carrier through full ship “shock trials”, though language placed in the House Armed Services Committee annual defense bill last month has given the Navy an out on conducting the test. Instead, trials would be conducted on USS John F Kennedy, the second carrier in the new class.

By skipping these tests on the Ford, Navy officials hope to make the carrier available sooner for overseas operations. It was reported back in late 2015 that conducting the tests would delay the carrier’s first deployment by two years as the Navy fixed what was broken.

………

Two recent reports have highlighted the difficulties with the Ford, which is designated CVN 78. The first report was issued in December 2016. The Director, Operational Test and Evaluation (DTO&E) for the Department of Defense issued a stinging report that highlighted the many problems the ship was facing as it neared being delivered delivery.

Again, the issue here is all this unproven new tech. According to the report, “Poor or unknown reliability of the newly designed catapults, arresting gear, weapons elevators, and radar, which are critical for flight operations, could affect CVN 78’s ability to generate sorties, make the ship more vulnerable to attack, or create limitations during routine operations. The poor or unknown reliably of these critical subsystems is the most significant risk to CVN 78. Based on current reliably estimates, CVN 78 is unlikely to be able to conduct the type of high-intensity flight operations expected during wartime.”

………

The second report that was released earlier this month by the Government Accountability Office, or GAO, on Navy Shipbuilding was another harsh rebuke of the Navy’s decision to accept the Ford “from the shipbuilder in incomplete condition.”

As it stands now, according to the GAO, the Navy will spend at least an additional $779 million to complete construction of the ship and conduct tests that are required to validate the design. The GAO also echoed the earlier report in addressing the fact that the carrier will not have the necessary certifications to conduct aviation operations, navigation and cybersecurity protection and added that upon delivery the Ford will have “significant incomplete construction” where work on 367 compartments was deferred.
This should be the first example used in any definition of. "Hollow force."

Have I mentioned lately that our current system of defense procurement is seriously f%$#ed up?

Sunday, July 16, 2017

The Problem Was the Original Purchase

Austria will be removing the Eurofighter Typhoon from service ahead of schedule because they have found it too expensive to operate:
It is a matter of concern for an aircraft manufacturer when one of the richest countries in the world declares its fighter is too expensive to operate.

But then Austria is a something of a special case. Critics generally agree that the landlocked neutral state probably never really needed the 15 Eurofighter Typhoons it ordered in 2003.

In Austrian hands, the advanced multirole fighter, originally designed to tackle the latest Russian threats, has been relegated to an interceptor role, with many of its advanced electronic warfare systems removed.
I don't get why they bought the aircraft in the first place.  It's not like Slovenia is going to invade them any time soon.

My suggestion would be to replace it with an inexpensive subsonic aircraft, something like the BAE Hawk, but if they feel compelled to go with a supersonic aircraft to deal with the threat from Switzerland or Italy, I would suggest the Chinese/Pakistani JF-16, which is less than half the purchase price of western aircraft.

But even in this case, to quote Eisenhower, "Every gun that is made, every warship launched, every rocket fired signifies, in the final sense, a theft from those who hunger and are not fed, those who are cold and are not clothed."

Friday, June 30, 2017

This Has Disaster Written All Over It


Theodore Roosevelt Full Ship Shock Test
The US Navy wants to defer shock testing on the Ford class carriers until the 2nd ship and got a provision in the latest defense appropriation bill allowing them to do this, because, after all, it's not like it's ever going to see combat, or have a weapons handling accident, or run aground, or collide with a garbage scow.

Seriously?

This ship has a new catapult and arresting gear using a new electromagnetic technology, a new reactor, a new radar, a different computer architecture, a new ordinance handling system, a modified hull, and increased automation to reduce crewing.

Any of these systems could be impacted very differently by shock than the legacy systems on the Nimitz class, and the Navy wants to deploy the first ship in class without testing.

This is simply insane.

Wednesday, June 21, 2017

As Atrios Would Say, "Time for a Blogger Ethics Panel."*

The Wall Street Journal has just fired its chief foreign affairs correspondent because he was negotiating a business partnership with an arms merchant that he was also covering:
The Wall Street Journal on Wednesday fired its highly regarded chief foreign affairs correspondent after evidence emerged of his involvement in prospective commercial deals — including one involving arms sales to foreign governments — with an international businessman who was one of his key sources.

The reporter, Jay Solomon, was offered a 10 percent stake in a fledgling company, Denx LLC, by Farhad Azima, an Iranian-born aviation magnate who has ferried weapons for the CIA. It was not clear whether Solomon ever received money or formally accepted a stake in the company.

"We are dismayed by the actions and poor judgment of Jay Solomon," Wall Street Journal spokesman Steve Severinghaus wrote in a statement to The Associated Press. "While our own investigation continues, we have concluded that Mr. Solomon violated his ethical obligations as a reporter, as well as our standards."

Azima was the subject of an AP investigative article published Tuesday. During the course of its investigation, the AP obtained emails and text messages between Azima and Solomon, as well as an operating agreement for Denx dated March 2015, which listed an apparent stake for Solomon.

………

Read some of the source documents here: https://www.documentcloud.org/documents/3871143-Jay-Solomon-Documents.html
This doesn't just happen with people covering arms dealers. 

The very rich use their wealth to shape the news and bribe and or intimidate journalists routinely

*Atrios was early to the blogging phenomena, and noted how many in the MSM dismissed blogs because there were no editors, and thus no journalistic ethics. Whenever a mainstream reporter is shown to be corrupt, he ironically made this comment.

Friday, June 16, 2017

Gripen E Makes Maiden Flight

The upgraded Gripen, which is basically a completely new aircraft, jas just made its first flight:
Swedish aerospace and defense company Saab has completed the first flight of its prototype E-model Gripen fighter jet.

The prototype, coded 39-8, took to the air at 10:32 a.m. local time June 15 from the company’s development facility at Linkoping, flying for 40 min. and reaching an altitude of 13,000 ft. before touching down safely.

Video and imagery of the aircraft departing and inflight showed a relatively short takeoff run in dry power and revealed that the company retracted the landing gear inflight, a relatively rare occurrence in first flights. Two twin-seat JAS-39D Gripens acted as chase aircraft.
The aircraft took 10 years to develop, which by the standard of modern fighter development is a very short time, and while pricier than its it is still far cheaper to operate than its competitors.

Total employment on the program is less than that of just the program office for the F-35, and total development cost for the program was less than that of the most recent software release for the JSF. (link)

There is no reasonable justification for the protracted and expensive developments that have become the standard in western fighter programs.

Here is a PR video from Saab: